It's been a while since I updated my progress. The winter was cold and snowy, which deterred my willingness to work out in the shop. But spring is here now, and I have vowed to finish this before a year is up.
Recently I began painting the interior, and over the last weekend I glued up the inwale. This rail runs inside the boat, and provides a place for the belay pins I wrote about in the previous episode. In the photo (at right) you see the clamps in place on the inwale. There's a bunch of other clutter in the boat as well (as usual). That long stick is to become the tiller (attaches to the rudder, used to steer). The other longer stick will be glued to the opposite side as a inwale as well.
I've also finished building and painting the rudder meanwhile. I think I will install rub rails this week, and seats, and hopefully begin oiling the raw wood that won't be painted. Next week I hope to get the rigging in place. The hull will splash water this spring for sure.
Sunday, March 12, 2017
Sunday, September 25, 2016
Payback
Last time I posted about the awesome belaying pins my buddy made for me. To return the favor, I made this door mat from a pattern found in The Arts of the Sailor by Hervey Garrett Smith.
It took 50 feet of 3/8-inch manila, and another 20 feet of 1/2-inch around the outside. My first attempt was in 1/4-inch rope, and there 50 feet made a hotpad trivet for the table not much bigger than a doily. This one looks a little lumpy, but I think it will flatten out as it gets stepped on.
Just a small distraction from painting the boat. The weather being colder, I couldn't paint. But this week promises temps in the 70s, so I hope to finish painting the bottom. I'm going with Rustoleum.
It took 50 feet of 3/8-inch manila, and another 20 feet of 1/2-inch around the outside. My first attempt was in 1/4-inch rope, and there 50 feet made a hotpad trivet for the table not much bigger than a doily. This one looks a little lumpy, but I think it will flatten out as it gets stepped on.
Just a small distraction from painting the boat. The weather being colder, I couldn't paint. But this week promises temps in the 70s, so I hope to finish painting the bottom. I'm going with Rustoleum.
Friday, September 16, 2016
A Home-made Boat
Back when I was sailing the fiberglass production model Lido 14, I thought a home-made boat might look amateurish and clumsy. The Lido looked like a professional job. But the more I sailed that boat, the more I decided it had no character, and no soul.
So I'm feeling very close to finishing the new boat, the boat I built myself. I've been told I could have it finished in a week, if only I didn't have to work my day job. And it doesn't look too clunky, if I do say so myself. I've made almost everything on the boat myself. I milled the scantling timbers myself out of 2x8 lumber. I laid the epoxy and fiberglass myself. I designed new elements beyond the plans, like the foreward hatch, and the centerboard. My wife and I sewed the sail together, and I set the grommets.
But this evening I got by with a little help from my friend Cody. He's an incredible wood worker. I was worrying about how to make the belaying pins for the rigging. I want this boat to feel salty, and belaying pins do that. Round things require a lathe that I don't have. Cody, however, also makes his own gear, and he made a lathe that is powered by a foot treadle. And he made my belaying pin in an hour. It would have taken me several hours (and several failures), or else I would have had to pay $12 each plus shipping to order them online. So I don't feel too bad about having something I didn't make myself.
So I'm feeling very close to finishing the new boat, the boat I built myself. I've been told I could have it finished in a week, if only I didn't have to work my day job. And it doesn't look too clunky, if I do say so myself. I've made almost everything on the boat myself. I milled the scantling timbers myself out of 2x8 lumber. I laid the epoxy and fiberglass myself. I designed new elements beyond the plans, like the foreward hatch, and the centerboard. My wife and I sewed the sail together, and I set the grommets.But this evening I got by with a little help from my friend Cody. He's an incredible wood worker. I was worrying about how to make the belaying pins for the rigging. I want this boat to feel salty, and belaying pins do that. Round things require a lathe that I don't have. Cody, however, also makes his own gear, and he made a lathe that is powered by a foot treadle. And he made my belaying pin in an hour. It would have taken me several hours (and several failures), or else I would have had to pay $12 each plus shipping to order them online. So I don't feel too bad about having something I didn't make myself.
Saturday, September 10, 2016
Fall weather closing in
The mornings are down in the 40s these days, with a cool, fresh bite in the air. Daytime temps are still in the 80s. Once temps dip down below 70F in the daytime it really puts a crimp in the cure time of epoxy. It seems the boat (is she called Romany? Furthur? Calypso? other suggestions?) is sooo close to being done, but there are still a hundred items on the completion list. Installing the inwale, the mooring bitt, the mast step, the skeg, the seats. The whole rudder is still just a dream, though I have the hardware in hand. And then there's all the paint and varnish. Not to mention rigging: installing the various cleats and blocks and lines and sail.
But small slow progress continues. Today I installed the mast partner. That's the part about a foot above the floor that holds the mast. It looks and feels solid, if I do say so. I still need to install the mast step: the part that seats the foot of the mast against the floor. I got another gallon of epoxy in the mail last week, and today I started laying fiberglass on the floor and deck. There's still a couple of hours of daylight, so I might get a little more done as well.
That's not my actual mast, by the way. It's a section of lodgepole pine that I thought about using as a mast, but in the end I glued up a couple of 2x4s (pronounced "tubafer"), and rubbed off the corners until it looked sort of round. But it still gives you the general idea, doesn't it?
But small slow progress continues. Today I installed the mast partner. That's the part about a foot above the floor that holds the mast. It looks and feels solid, if I do say so. I still need to install the mast step: the part that seats the foot of the mast against the floor. I got another gallon of epoxy in the mail last week, and today I started laying fiberglass on the floor and deck. There's still a couple of hours of daylight, so I might get a little more done as well.That's not my actual mast, by the way. It's a section of lodgepole pine that I thought about using as a mast, but in the end I glued up a couple of 2x4s (pronounced "tubafer"), and rubbed off the corners until it looked sort of round. But it still gives you the general idea, doesn't it?
Monday, August 29, 2016
Sampson Post
Work proceeds apace as the last days of summer wane and autumn weather lies boding on the horizon. Will this boat float this year?
All sorts of distractions keep me from working on it. Last week my school teaching gig picked up again, ending the long summer days when I could gaze wistfully at the boat shaped thing and ponder my next move. Now I have no more than two hours at a time in the evening to get something done.
Over the weekend I managed to get several pieces cut which will become the supports for the center thwart bench, and also for the "sternsheets" seat. I have no idea why they call it that. Stern as in rear of the boat, and sheets means a control line on a sail, but "sternsheets" somehow means the seat in the back of the boat. It also functions as an airtight chamber for reserve buoyancy.
But the big news today is that I cut and fitted the foredeck (is it too presumptuous to call it a "foc'sl"?) and sampson post. The front deck also functions as an airtight chamber for flotation. Because it is fitted with inspection ports, you could use it as cargo space, but anything you put in there detracts a bit from the reserve flotation. That's why I made the foredeck 4 inches lower than the sheer (top edge), so that I could lash cargo up on the deck.
In addition to the foredeck you may notice the sampson post in the middle of the foredeck. "Won't that get in the way?" you ask. Well, maybe so. "Isn't it a little presumptuous, on such a small boat?" you ask. Well, maybe so. But it looks cool and that's all that matters. "What's it for?" you ask. I'm glad you asked. The sampson post is tied in to the framing of the boat below the deck so that you could really tug on it. After I finish all the assembly, I will install a bronze rod, or "bitt" cross-wise through the post. Then I will be able to use it as a towing point, or as an anchor tie-off. The area in front of the sampson post will be dedicated to storing an anchor I think.
With all of this flurry of activity I'm waiting for a good weekend day when I can glue a bunch of pieces into place. I have a gallon of epoxy coming in the mail. With all the pieces cut and ready, that will complete the major construction. All that's left will be rigging, paint and varnish. Stay tuned!
All sorts of distractions keep me from working on it. Last week my school teaching gig picked up again, ending the long summer days when I could gaze wistfully at the boat shaped thing and ponder my next move. Now I have no more than two hours at a time in the evening to get something done.
Over the weekend I managed to get several pieces cut which will become the supports for the center thwart bench, and also for the "sternsheets" seat. I have no idea why they call it that. Stern as in rear of the boat, and sheets means a control line on a sail, but "sternsheets" somehow means the seat in the back of the boat. It also functions as an airtight chamber for reserve buoyancy.
But the big news today is that I cut and fitted the foredeck (is it too presumptuous to call it a "foc'sl"?) and sampson post. The front deck also functions as an airtight chamber for flotation. Because it is fitted with inspection ports, you could use it as cargo space, but anything you put in there detracts a bit from the reserve flotation. That's why I made the foredeck 4 inches lower than the sheer (top edge), so that I could lash cargo up on the deck.
![]() |
| Foc'sl, inspection hatches, and sampson post |
With all of this flurry of activity I'm waiting for a good weekend day when I can glue a bunch of pieces into place. I have a gallon of epoxy coming in the mail. With all the pieces cut and ready, that will complete the major construction. All that's left will be rigging, paint and varnish. Stay tuned!
Monday, August 22, 2016
Uncle Richard
A sailboat needs a sail. This little boat I'm building called for a "balanced lug sail" which means the sail hangs from a spar ("yard") which crosses the mast. This yard hangs in a balanced fashion. Lug sails are four-sided trapezoids. This sort of sail is rather old fashioned, but the style is making a resurgence among sail-&-oar types. It is simple and easy to handle, particularly single-handed (as in one fellow on his own-- not with one hand tied behind the back).
Because the lug sail is sort of old-fashioned, I had no luck finding a used sail. Most modern production boats use triangular sails, like the old Lido you heard me cursing in earlier posts. So I couldn't really find a used sail. And when I asked sail makers to sew a new one, I got quotes in the $500 range. That seemed exorbitant to me since I bought a used sail outfit for the Lido for only $200. What's a fellow to do?
I called Sailrite! This outfit cuts sail panels for standard patterns and sells the cut sailcloth ready to sew up. And at half the price of buying the sail ready made! They send a kit complete with thread, seam tape, grommets, and instruction. For an extra $40 they will sell you the tool to set the grommets.
My good wife agreed to sew the panels for me. It made for eight hours of relationship-building quality time as I supervised and shuffled pieces into the machine. So much of sailing, and boat building is not really about sails or boats at all, but rather about managing the interpersonal dynamics that allow these activities to happen.
Uncles are good people to have around. I have three brothers, all of them good uncles to my six daughters. They get it from having experienced the benefits of having uncles in their lives when they were children. My father also had uncles as he was growing up, and they facilitated his adventures. In our last installment we met Uncle Doug, who helped me with fiberglass on the boat. Today we meet Uncle Richard, a brother to Doug and my father.
Richard had a mother the like of which all little boys might wish for: my Grandmother. When Richard was 9 year old (1958), she helped him sew and fabricate a hang glider. He launched the glider from a bluff in Kaysville, Utah, and simultaneously launched a lifetime of flight. As an adult he joined the Air Force reserves, and built a business in supplying sails and wings for boats, parasail gliders and ultralight craft.
Naturally, once my sail was sewn I took it to Uncle Richard to set the grommets. After all, I'm a bargain shopper, and there's no need to buy the grommet tool if Uncle Richard can help me out. He looked at the sail and said, "Are you sure you want a second row of reef points?" I said, "yup." He advised that I consider the second row of reefing like a four-wheel drive. When you get stuck in 2WD, you use the 4WD to get unstuck, and then you go home. You don't use it to go deeper and get stucker. So when I find myself tucking in that second row of reefs, that's the time to head for shore and wait it out until the wind dies down.
Naturally, as soon as I got home with the sail, I had to start making a spar to hang it from. Watch for more details about yards, booms, masts etc.!
![]() |
| Balanced lug sail in Wyoming. Courtesy chip-skiff, |
I called Sailrite! This outfit cuts sail panels for standard patterns and sells the cut sailcloth ready to sew up. And at half the price of buying the sail ready made! They send a kit complete with thread, seam tape, grommets, and instruction. For an extra $40 they will sell you the tool to set the grommets.
My good wife agreed to sew the panels for me. It made for eight hours of relationship-building quality time as I supervised and shuffled pieces into the machine. So much of sailing, and boat building is not really about sails or boats at all, but rather about managing the interpersonal dynamics that allow these activities to happen.
![]() |
| Richard Cheney (circa 1972) with the glider he launched at age 9. |
Richard had a mother the like of which all little boys might wish for: my Grandmother. When Richard was 9 year old (1958), she helped him sew and fabricate a hang glider. He launched the glider from a bluff in Kaysville, Utah, and simultaneously launched a lifetime of flight. As an adult he joined the Air Force reserves, and built a business in supplying sails and wings for boats, parasail gliders and ultralight craft.
![]() |
| My new sail! 72 square feet of adventure. |
Naturally, as soon as I got home with the sail, I had to start making a spar to hang it from. Watch for more details about yards, booms, masts etc.!
Saturday, July 30, 2016
Uncle Doug
This morning Uncle Doug is helping me fiberglass the boat. Or rather, Uncle Doug is fiberglassing the boat, and I'm helping. Or watching. My most valuable contribution is keeping the work on track and moving forward. Doug has a lot of stories to tell.
Subscribe to: