The mornings are down in the 40s these days, with a cool, fresh bite in the air. Daytime temps are still in the 80s. Once temps dip down below 70F in the daytime it really puts a crimp in the cure time of epoxy. It seems the boat (is she called Romany? Furthur? Calypso? other suggestions?) is sooo close to being done, but there are still a hundred items on the completion list. Installing the inwale, the mooring bitt, the mast step, the skeg, the seats. The whole rudder is still just a dream, though I have the hardware in hand. And then there's all the paint and varnish. Not to mention rigging: installing the various cleats and blocks and lines and sail.

But small slow progress continues. Today I installed the mast partner. That's the part about a foot above the floor that holds the mast. It looks and feels solid, if I do say so. I still need to install the mast step: the part that seats the foot of the mast against the floor. I got another gallon of epoxy in the mail last week, and today I started laying fiberglass on the floor and deck. There's still a couple of hours of daylight, so I might get a little more done as well.

That's not my actual mast, by the way. It's a section of lodgepole pine that I thought about using as a mast, but in the end I glued up a couple of 2x4s (pronounced "tubafer"), and rubbed off the corners until it looked sort of round. But it still gives you the general idea, doesn't it?

No comments:

Post a Comment